Results 1 to 6 of 6

제목: 케쉬재단_플라스마 발전기, Plasma Reactor

  1. #1

    케쉬재단_플라스마 발전기, Plasma Reactor

    http://www.keshefoundation.org/en/shop/product/view/2/3


    Sale of Keshe Foundation 3-4 KW and 10 KW Plasma Power Generators

    As has been explained on the Keshe Foundation forum - link - Stichting the Keshe Foundation to support the setting up of its International Space Institute from today proceeds with the commercialisation of its power generators.


    We initially offer 10 000 units of 3-4 KW AC/DC and 1000 units of 10 KW AC/DC portable domestic Keshe electric power generators.

    We are planning to allow the use of these initial units to be in the motor cars as well as for the house.

    Thus we have entered the energy power supply in its true sense and we will deliver the units that will be more powerful that can be used in the house or in the electric cars which will never need charging and there will be no limitation of their use and mileage that car power supply will not need re-charging and there is no need for battery in the car.

    This allowing the use of DC and AC motors or combination of booth from the supply for more powerful systems.




    Prices

    • 3-4 KW AC/DC units : € 5 000
    • 10 KW AC/DC units : € 20 000





    More info




    How to make a reservation?


    • Reservation for the 3-4 KW AC/DC units can now be made through this pdf

    • Reservation for the 10 KW AC/DC units can now be made through this pdf


    Please do not order by our shop system here below, read the reservation PDF documents.

  2. #2
    Last edited by wave; 2012-09-07 at 19:04.

  3. #3
    Administrator wmaster's Avatar
    가입일
    2012-06-18
    게시글
    321
    블로그 글
    9
    Downloads
    7
    Uploads
    11
    발전기 소식

    As we promised we will try to let you know about the technology and delivery of the Keshe Foundation Generator.

    As we try to keep our reactor development on time and keep in line with our research, we have been unable to deliver the generator due to two points.

    The first was that we were restricted in delivering the original generators which were using nuclear base materials.

    After the Foundation meeting resistance from government officials and organizations in Belgium and final confiscation of laboratory materials and destruction of materials by them, which we even had to pay for their destruction and in this process they trying to stop us from delivering systems, the Foundation was foreseeing such a move and started new development of new types of reactor which could by pass any governmental restrictions.

    To stop the same to happen to the generators being delivered to our clients through and due to use of nuclear materials restriction, the Foundation brought its research in advance reactor into operation in late September.

    This meaning that we went step further and started development of the what we call the seventh generation reactors, which these systems do not use nuclear materials and allow new plasmatic systems to be used.

    These reactors were tested last year and we were ready to produce the seventh generation systems reactors for late last year and early this year.

    In final tests of these reactors we have found failures with vacuum seal mechanism during the energy production and it has taken longer than we estimated to correct the maul functioning of the sealing systems of the reactor.

    We assessed that these problems with seals will be eradicated and be solved by early this years and we will be able to deliver the systems on time.

    After re-designing the seals mechanism, we are behind in testing of these new seal systems and they should have been ready for test by Mid-February.

    Due to delivery from suppliers for some parts of the new seal systems we are behind the testing and releasing the generators.

    Once we receive the newly manufactured parts in the second week of March from the manufactures: It will take us another 15 to 30 days to test and finally release the generators.

    It has to be said that Foundation has only received less than 150 deposits for generators, which this even does not justify production cost of systems on commercial bases.

    But as we have promised and we are fine-tuning the systems and will deliver the less than 150 units to whom placed the orders for them.

    Therefore it is up on you whom have ordered to make a decision if you like to wait for the final testes or recall your deposits and the Foundation within 30 days of your request will transfer the founds back to the account which the founds was originally received from.

    We are not happy with the situation, but there were situations which we could not work under and deliver systems which were going to be confiscated, or to be recalled.

    There has been physical practical damage to the seals due to operation and it had to be corrected and these failures could not be foreseen and now new systems for correcting this failure has been developed and are getting manufactured and being in the process of being assembled and we start test in the next 15 days.

    We are very optimistic that this will solve the seal problem and allows us to deliver systems without failure.

    These seals were not needed for nuclear based systems and now we have to use them for the non-nuclear systems and problem were not foreseen.

    The damage comes through usage and thus it had to be corrected.

    I hope those whom ordered understand and we leave the decision up on you to recall your deposit or allow us to correct the systems that we can deliver a full working system to you.

    M T Keshe
    On behalf of the Keshe Foundation


    http://forum.keshefoundation.org/sho...nerator/page10

  4. #4
    Administrator wmaster's Avatar
    가입일
    2012-06-18
    게시글
    321
    블로그 글
    9
    Downloads
    7
    Uploads
    11
    The Keshe Foundation making the following announcement regarding the development of the power generator.

    The non-nuclear reactor that is the basis of the power generator was received from the manufacturers this week.

    The reactor will be put through the setting and start-up processes in the next 2- 3 weeks.

    Following this the Foundation starts the full testing of the new system and during this phase starts developing the plasma in the core using the non-nuclear material core.

    We will report the results to the forum by the end of May.

    From time to time we will post on this forum videos of the tests or pictures of the results from the Foundation’s lab.

    As we promised, we gave the USB sticks to governments and waited for their response.

    Last year we started negotiations with several organizations and governments to bring the power generator into mass production in different nations and into the hands of the public.

    Now in most cases the technology has gone from government to industrial partners and from this point on the technology is in the hand of each nation.

    The scientists from these nations will come to the Foundation research center or we will go to them and they will develop their own prototype for their nation.

    The Foundation with their commercial partners has guaranteed mass production in six nations.

    The next step after June will be the process of certification in each nation.

    From this point on the knowledge and know-how is in the hands of more than 100 scientists around the world and the new technology is available to the world of science.

    In time we will make the technology available to the general public.

    From now on it is the responsibility of the commercial partners in each nation to announce who they are and where they are with regard to the commercialization.

    As part of our agreement with all partners, the Foundation will deliver power generators to those who do not have the financial resources to afford them easily and thus the technology will reach the poor at the same rate as the rich.

    Thus class division will be overcome through science and we will allocate all profits from our commercial stake in the production of the generators in each nation to the benefit of its own citizens, so that the comfort of all will be improved at the same speed.

    This principle of spending of profits on its citizens is written into the mandate for the commercial activities of the companies in each country and hence our ethos is adhered to.
    M T Keshe

    Director of the Keshe Foundation


  5. #5
    Administrator wmaster's Avatar
    가입일
    2012-06-18
    게시글
    321
    블로그 글
    9
    Downloads
    7
    Uploads
    11

    Post The new reactor and change in the course for human race

    The new reactor and change in the course for human race

    In years of research, I have been observing phenomenon which was clear to me, but somehow I did not want to deal with this concept as I was too busy with other matters of the technology.

    But eventual this nagging knowledge had to be dealt with.

    The result of some forty years of research in the past weeks has led us to the development of one of the most powerful energy and Magravs systems known in the world of creation.

    To my knowledge this system can only be produced on earth due to its chemical composition of its present matters.

    I have seen the work of the miniature version of the system working as I have been carrying it for years, but it needed maturity of the knowledge and creation of the right environment before its release.

    Now I am pleased to inform the forum, that we have and can produce one of the most powerful non-nuclear energy systems ever known.

    Theoretically the full scale version can be done in days, but mechanically it can take up to six month to complete full control system.

    The system will weigh less than 100 grams and its power production can be in the region of 1-10 MW or even more.

    The systems Lift capability can be in the region of several thousand tones and the system Magravs boundary can be made to cover several kilometers.

    I have seen this reactor in miniature working about eight years ago and it was so amazing that I did not want at the time to deal with this.

    But through the medical research in the past weeks, there are no alternative but to go ahead and test the power of this new technology in full.

    I talked about this in my lecture in Tesla meets Keshe in our center last year, and no one in the audience grasped the concept.

    Now we are ready to fully design and develop this technology with its full applications and implications.

    This new system once operational can meet most of nation’s needs for power, energy for automotive, space motion, environmental cleanup; medical, water shortages, hunger and so forth.

    The process of production of this reactor is very easy and we try to make the system in miniature reactor in collaboration with one of the world leading nations in the coming month in our work with them.

    I can see that the two mobile phone systems to produce as much energy as one needs to live a comfortable life, which I have been talking about in my lectures, is now fully realizable anywhere on this planet at the cost of a cup of coffee or a can of soft drink.

    The home unit should not be hard to make that it can produce as much as one's needs for clean water and energy using a mobile phone anywhere on this planet.

    In Africa this will change the course of humanity as even in the remotest villages there is a mobile phone, which it can produce the energy needs of the whole village.

    This system has been the dream of universal Magravs producing cultures, and this puts human race at the forefront of the universal power and space motion technology, due to uniqueness of the earth physical Magravs structure.

    The earth now with this technology becomes the center of universal lift and motion systems as this systems cannot easily be produced in space even though the knowledge to produce materials are known to other civilizations.

    I will try to explain this in details in the near future, as I have physically to make a new version, but this new reactor technically make energy crises of the present time irrelevant and the whole energy supply of all nations can be met in a few months without a need for overhead cables and small satellite energy systems

    We invite the major power producing nations like France and USA and companies like Suez which has been actively trying to discredit and blocking us for years in universities and governments across the world to arrange a conference for discussion and the commercialization of this new technology as from now on there is no more energy crises.

    I was going to announce this development in Varna-Bulgaria last week in the three days conference, but I needed time to secure some points that our lives will not be in danger, now we are ready to take on major world nations for the balance of power in energy and space motion.

    This new technology makes a nation like China energy self-sufficient in matter of month as they have all the materials they need to produce and meet their internal demand for energy and water production.

    We promised the course of change through world peace, now we deliver the tools of peace to every nation and man on this planet.

    We have secured our knowledge through appropriate channels that this technology by taking me out will not be blocked.

    Leading nations and scientists whom have been working with us in development of the spaceship program are now fully in possession of this technology and we are ready to release full design of systems to a number of nations that they can collectively in collaborating they can bring balance in the world energy and spaceship program.



    M T Keshe
    The director of the Keshe Foundation

  6. #6
    Administrator wmaster's Avatar
    가입일
    2012-06-18
    게시글
    321
    블로그 글
    9
    Downloads
    7
    Uploads
    11
    Sale of Keshe Foundation 3-4 KW power generator

    As has been explained on the Keshe Foundation forum

    Stichting the Keshe Foundation to support the setting up of its International Space Institute from today proceeds with the commercialisation of the its power generators. We Initially offer 10 000 units of 3-4 KW AC/DC portable domestic Keshe electric power generators.





    발전기 소식, 7월13일
    금년 가을에 결과를 내놓을 예정

    3~4 KW급 발전기 제작

    The setting of the new reactor after three month of development was completed this week.

    The reactor is now going through initial testing and then test for full load will start in the coming weeks.

    We should be able to confirm the testing process, results and the working of the systems with release of videos in the next 6-8 weeks.

    M T Keshe
    The Founder of the Keshe Foundation

    http://forum.keshefoundation.org/sho...ll=1#post11988

이 주제글의 글단추(태그)

글쓰기 권한

  • 새 글 작성이 불가능함
  • 응답글 작성이 불가능함
  • 파일 첨부가 불가능함
  • 내 글 수정이 불가능함
  •